Vastwin

Nanjing Wuqiao South Tunnel Shield Machine Transportation Project

From:广瀛物流 Posted on:2019-10-16 Belong to:Municipal construction


Working time: October 2017 
Project Location: Jiangxinzhou, Qiaolin, Dashengguan, Yangzhou 
Equipment specifications: the largest part of the main drive, 8.3 * 8.3 * 2.5 (m), 240 tons 
Entering the vehicle: Hydraulic Flatbed (SPT) 
Operation content: The shield machine and supporting equipment will be integrated into the internal transportation from the four storage sites. After the integration in Nanjing, part of it will be transported to the Guangzhou base and partially to the Jiangxinzhou base.